Re: drywall repair and painting contract
Posted by Joel Torode on 9/26/08
On 12/06/05, james e. duggan wrote: >As a buyer I would tell the supplier to include it in the job. Fixing four holes instead of three is so negligible from a cost perspective its humorous they even bring it up. He is probably trying to hose you for some extra dollars.
Posts on this thread, including this one
- drywall repair and painting contract, 12/06/05, by james e. duggan.
- Re: drywall repair and painting contract, 12/06/05, by v.
- Re: drywall repair and painting contract, 12/07/05, by Dean.
- Re: drywall repair and painting contract, 8/31/08, by Jagdeep kahlon.
- Re: drywall repair and painting contract, 9/26/08, by Joel Torode.
- Re: drywall repair and painting contract, 11/30/08, by TED.
- Re: drywall repair and painting contract, 2/08/11, by W R Harris.
- Re: drywall repair and painting contract, 2/08/11, by W R Harris.
|